Punch Lists WelcomeMHIC #05-142998 · InsuredSaturdays AvailableSite Cleaned Before We Leave
East Street, Frederick · Saturdays Worked

Finish Carpenter in Frederick, MD

Trim, built-ins, doors — and the list of small things everybody else has declined to quote.

The Punch List

The Last Five Percent Nobody Comes Back For

A new build or a renovation finishes and there is always a list. It is too small for the builder to mobilise for, too fiddly for a handyman, and it is what you look at every day.

hands measuring a timber plank with a tape measure

After a new build

Doors that bind, missing quarter round, a stair spindle that moves, shelving the builder priced out. Typically one to three days for the whole list.

an empty room with a wood floor and white painted trim

After a renovation

The trim the other trades cut into, the gap where the new floor meets the old, the cabinet filler nobody ordered. We make the joins disappear.

a plain interior door in a white painted frame

Before you sell

The forty small things a buyer's inspector writes down. Cheaper to fix in two days than to negotiate against for a month.

1-3 daysTypical Punch List, Start To Finish
SaturdaysWorked, So You Do Not Lose A Weekday
162Google Reviews At 4.9 Stars
0Jobs Left Ninety-Five Percent Done
a circular saw resting on timber at a workbench
About Hovdal

We Took The Jobs Nobody Wanted

Hovdal started because every carpenter in Frederick was quoting kitchens and nobody was returning calls about a list of twelve small things. Those lists are now most of our work, and they are how almost every larger job we do begins.

It changes how we are set up. The van carries trim stock, hardware and a finish kit so a forty-item list does not become four trips to the lumber yard. And we work Saturdays, because the person with the list is usually the person who cannot be home on a Tuesday.

  • Lists priced as one job, not item by item
  • Van stocked so the list does not become four supply runs
  • Saturdays worked at the same rate as weekdays
  • Nothing left at ninety-five percent
Why Lists Get Left

Three Reasons Nobody Finishes The Last Bit

None of them are about skill. Knowing them is how you get the list done.

It does not pay to mobilise

A builder's crew costs the same to send out for two hours as for two weeks. A twelve-item list is a loss for them, so it keeps sliding down the schedule until the job closes out.

It is not one trade

A typical list is carpentry, a bit of caulk, a hinge, a shelf. Most contractors only want their own scope, so the list gets split three ways and never reassembles.

Nobody wants to price it

Quoting forty small items properly takes longer than doing several of them. That is why we price a list as one job with a day rate and a realistic number of days.

How It Goes

List To Done In Four Steps

01

Send the list

One line per item. Photos help. Forty items is normal and not a problem.

02

We price the lot

A day rate and a realistic number of days, not forty separate line items.

03

We book a date

Weekday or Saturday, same rate. You get the date in writing.

04

We finish it

We walk the list with you at the end and tick every line before we invoice.

Reviews

What Frederick Says

Our builder finished in March and left about forty small things. Four carpenters would not quote a list that size. Hovdal came for two days, did all of it, and sent one invoice.
Priyanka N.Urbana
Doors that never closed, a stair spindle that wobbled, quarter round missing in two rooms. All the stuff you stop noticing until you try to sell. Gone in a day and a half.
Ed T.Downtown Frederick
They came on a Saturday, which meant neither of us had to take a day off. I did not know that was an option until I asked.
Marcus L.Middletown
a room lined with floor-to-ceiling built-in bookcases
Bigger Work Too

Most Big Jobs Start As Somebody's List

We are not only a punch-list shop. Roughly half our built-ins, and nearly all our deck work, come from customers who first called us about something small and then asked what else we could do.

So the list is a good way to try a carpenter without committing to a kitchen. If it goes well, the bookcase conversation happens on day two, on site, with the person who will actually build it.

  • Built-ins, cabinetry and shelving designed and built to the room
  • Decks, porches and railings, permitted where Frederick County requires it
  • Structural repairs with an engineer's drawing where one is needed
  • Same carpenter, whether it is two hours or two weeks
Booking Now

Got A List?

Send it as it is. The longer it is, the more sense it makes to do it in one go.

Questions

Before You Send It

How small is too small?

Nothing is. We have driven out for one sticking door. Small work is charged hourly with a one-hour minimum, and if you can group it with two or three other things it is better value for you and a better day for us.

How do you price a long list?

As one job — a day rate and a realistic number of days — rather than forty line items. Pricing each item properly would take longer than doing several of them, and that cost would end up on your invoice.

Do you really work Saturdays?

Yes, at the same rate as a weekday. We hold Saturdays for people who cannot be home midweek. They book out first, so the further ahead you ask the better.

Can you do the whole punch list after a new build?

That is most of what we do. Send the builder's list or your own; typical lists are one to three days. If something on it is genuinely the builder's warranty obligation we will tell you so rather than quietly charge you for it.

Do you do bigger jobs?

Yes — built-ins, cabinetry, decks, structural repairs. About half of those started as somebody's small list. There is no obligation either way.

Are you licensed and insured?

Maryland Home Improvement Commission license 05-142998, with general liability and workers' compensation. Certificates go out with every quote.

Send Us Your List

One line per item. Photos help. We will come back with a number and a date, usually within two working days.