Design Studio on Idaho Street4.9★ · 140+ reviewsAllowances Published, Not Hidden6-8 Weeks On Site
Kitchen Design & Build · Boise, ID

Designed Once, Properly: Kitchen Remodeling in Boise, ID

We design in our studio on Idaho Street and install with our own joiners — no handoff to a subcontractor who wasn't in the room. You get one designer from the first sketch to the last handle, and an allowance sheet instead of a lump sum.

Boise, Idaho

What We Do

Full Kitchen Remodels

Design, cabinets, counters, lighting, flooring and the trades. One contract, one designer, one crew.

Cabinet Design & Installation

Frameless and face-frame, semi-custom through full custom. We'll show you the boxes side by side before you choose.

Countertops & Splashbacks

Quartz, granite, porcelain and solid timber. Templated after cabinets are set, never before.

Islands & Seating

Including the unglamorous part — whether your floor and services can actually take one where you want it.

Pantry & Storage Design

Where most of the daily happiness in a kitchen actually lives. Usually the cheapest part of the job to get right.

Appliance Integration

Panel-ready, integrated and built-in, specified BEFORE the cabinets are ordered. See below for why that matters.

Kitchens and pantries. We don't do bathrooms, and we'll tell you who does.

open kitchen drawers showing the cabinet carcass and runners inside
The Part You Never See

The Box Is 70% of the Price. Nobody Shows You One.

Kitchen quotes get compared on doors, handles and worktop, because that is what a showroom puts in front of you. But most of what you're paying for is the carcass behind the door — and it is the one component you will never look at again after installation day.

So we put two boxes on the table at the first meeting. One ours, one the cheap one. You pull both drawers out. The conversation about price gets a great deal shorter after that.

  • Plywood carcass, not particle board, on everything we build
  • Full-extension soft-close runners rated to 100lb as standard
  • Frameless (European) or face-frame — we'll explain the real difference
  • Doors and drawer fronts are the cheap part to change later; boxes aren't
Real Numbers

What a Boise Kitchen Costs, and Where It Goes

2026 all-in ranges for a typical 200-250 sq ft kitchen. We quote with published allowances for the things you haven't chosen yet, so you can see exactly what moves the number.

01

$28,000 - $45,000 · Refresh, same layout

New semi-custom cabinets, quartz counters, splashback, sink, tap, lighting and paint. Nothing moves. Appliances yours.

02

$45,000 - $75,000 · Full remodel, layout changed

The above plus moving plumbing and electrical, a new island, flooring through, and usually a wall opened up. This is where most of our work lands.

03

$75,000 - $130,000 · Custom cabinetry

Built rather than ordered, stone slab, integrated appliances, structural work. Twelve to sixteen weeks including the build.

04

Where the allowances sit

Counters, tile, handles, tap, lighting and flooring are allowances on your quote with a per-unit rate. Choose under and you get the difference back; choose over and you see the cost before you commit, not on the final invoice.

05

What we don't put an allowance on

Cabinets, labour and the trades — those are fixed. An 'allowance' on cabinetry is how a low bid becomes a high invoice, and it's the first thing to check on any quote.

The Ordering Mistake We See Most

Appliances Have to Be Chosen Before Cabinets Are Ordered

Not after. This is the single most common and most expensive sequencing error in a kitchen remodel, and it is entirely avoidable.

Panel-ready changes the cabinet order

An integrated fridge needs a panel built to the appliance maker's spec, in the cabinet run, ordered with the cabinets. Decide afterwards and the run has to be re-made.

Ranges are not a standard width

30", 36" and 48" all exist and a 48" range changes the whole cabinet layout, the hood, the gas line and often the electrical. It is a design decision, not a shopping one.

Ventilation drives the ceiling

CFM requirements set the duct size and route. On a second storey that can mean a soffit you weren't expecting. We settle it at design stage.

Built-ins need their power in the right cabinet

Ovens, warming drawers and coffee machines each need a circuit landing in a specific box. Rough-in happens before cabinets, so the list has to be final by then.

So we ask for the model numbers

Before we order a single cabinet, we want the actual models. If you haven't chosen, we'll help — that's a design meeting, not a delay.

What it saves

A re-made cabinet run is typically $2,000-$6,000 and three to five weeks. We've never had to do one on a kitchen where the appliances were settled at design stage.

a temporary kitchen setup with a microwave and coffee maker on a counter
The Honest Bit

You Will Not Have a Kitchen for Six Weeks

Six to eight weeks on site is the realistic number for a full remodel, and for most of it there is no sink, no oven and no worktop. Any contractor telling you three weeks is either not moving anything or not telling you the truth.

What we can do is make it survivable, and we do it on day one without being asked — because the families who cope best are the ones who set up properly before demolition rather than improvising in week two.

  • A temporary bench, sink and fridge set up before demolition starts
  • Microwave, kettle and toaster relocated, not boxed
  • Dust walls and floor protection on every route through the house
  • A written week-by-week schedule so you can plan around the worst of it
310+Kitchens Designed
6-8Weeks On Site
16Years in the Valley
1Designer, Start to Finish

How a Kitchen Gets Made

Design takes longer than the build. That is deliberate.

1

Design call

Half an hour on the phone or in the studio. What's wrong with the kitchen you have, what you cook, and a realistic budget band. No charge.

2

Measure & concept

We measure, then draw two or three layouts. You'll see the cabinet boxes and the allowance sheet at this stage, not after you've signed.

3

Selections & order

Cabinets, counters, appliances and finishes all settled together. Cabinets are ordered only once the appliance model numbers are final. Four to eight weeks lead time.

4

Build

Six to eight weeks on site. Demolition, services, cabinets, template, counters, splashback, finish. Your designer is on site weekly, not just at the start.

5

Handover

You write the punch list, we work through it, and you get the care sheets and every warranty in one folder.

Questions Worth Asking Any Kitchen Company

What does 'custom' mean on your quote?

Three different things, and it's worth being precise. Stock is off-the-shelf sizes. Semi-custom is a catalogue with modifications — which covers most kitchens beautifully. Full custom is built to your drawing, and roughly doubles the cabinet cost. We'll tell you which one your kitchen actually needs.

Frameless or face-frame?

Frameless gives you more usable space and a flush modern look. Face-frame is more forgiving in an old house with out-of-square walls, and suits traditional doors. Neither is better; they suit different houses. We show you both.

How long is the whole thing, not just the build?

Twelve to twenty weeks door to door for a full remodel. Design and selections take four to six, cabinet lead time is four to eight, and the build is six to eight. Most of that is not on site.

Can I supply my own cabinets or counters?

Cabinets, no — we won't warranty an install on boxes we haven't specified. Counters and appliances, yes, and we'll say so on the quote so the allowance comes off.

Do you charge for design?

The first call and the concept are free. A full measured drawing set is $850, which comes off the contract if you proceed. It's yours either way — we don't hold drawings hostage.

What's the most common regret?

Storage, not finishes. People rarely wish they'd chosen a different worktop; they very often wish they'd spent another $1,500 on drawers instead of doors, and a proper pantry.

Start With a Conversation

Half an hour, no charge, and you'll leave with a realistic budget band and an honest view of whether we're the right studio for it.

Book a Design Call

Tell us about the kitchen you have and the one you want. We'll come back within a working day.

Book a Design Call