
Columbus Operations Consultant
Ship more, waste less, stop firefighting. We work on your floor with your people to fix the flow — no new software required.
Operations Consulting Services
Start with a two-day assessment, then fix the biggest constraint first.
Fixed-fee projects. You own every tool, template and board we build.

Operators First, Consultants Second
Everyone at Gristmoor ran a plant, a warehouse or a service operation before we ever advised one. We've been improving Ohio operations for fifteen years — from job shops in Columbus to distribution centers along I-70.
We work on the floor, in work boots, next to the people doing the job. The changes we make are the ones your supervisors can keep running on a Tuesday night shift, long after we've gone.
- ✓Former plant and operations managers
- ✓On the floor, not in the conference room
- ✓Practical lean — no belts or jargon required
Where We Do Our Best Work

Manufacturing
Job shops, fabricators and food producers with long lead times, messy changeovers or quality escapes.

Warehousing & Distribution
Pick errors, slow shipping and inventory that's never where the system says it is.

Field Service
HVAC, plumbing and electrical companies with too many callbacks and trucks crossing town twice.

Walk Your Floor With Us
We'll spend two hours on site with you and leave you with the three biggest improvement opportunities we saw — whether or not you hire us.
What Twelve Weeks Usually Changes
Throughput Up 15–30%
Same people, same equipment. Most of the gain comes from removing waiting, searching and rework.
Lead Times Cut In Half
A schedule built on real capacity means quoted dates you can keep, and fewer expedites.
Cash Freed From Inventory
Right-sized stock levels typically release 15–25% of inventory value back into the business.
From Plant Walk To Lasting Change
Plant Walk
Two free hours on site to see the flow and hear from the people doing the work.
Assessment
Two days of measurement and a ranked list of constraints, with a fixed-fee proposal.
Fix On The Floor
Eight to twelve weeks of hands-on improvement with your supervisors and teams.
Make It Stick
Daily huddles, visual boards and monthly check-ins so the gains don't fade.

Lean Without The Jargon
You don't need a belt, a binder or a new system to run a better operation. You need the people doing the work to see the problems, have a simple way to fix them, and a reason to keep fixing them.
That's what we build: clear standard work, visual boards on the floor, short daily huddles, and supervisors who know how to lead them.
- ✓Standard work your crews helped write
- ✓Visual boards instead of spreadsheets nobody opens
- ✓Supervisors coached to lead the daily routine
Common Questions
How long does a typical engagement last?
Most improvement projects run eight to twelve weeks after the two-day assessment. Some clients keep a monthly support day afterward to hold the gains.
How are fees set?
Every project has a fixed fee agreed after the assessment. No hourly billing, and you own every tool, template and board we build.
Will this disrupt production?
We work around your schedule — early mornings, off shifts or planned downtime for anything that touches a running line.
Will my people resist this?
Change sticks when crews help design it, so they do. We spend more time listening to operators than presenting to managers.
Do we need lean experience?
No. We teach what's needed as we go, in plain language, using your own work as the example.
Do you only work in Columbus?
We're based downtown and work across Ohio — Columbus, Dayton, Cincinnati and Cleveland — plus nearby Indiana, Kentucky and West Virginia.
See What Your Floor Could Do
Book a free plant walk. You'll get three improvement opportunities in writing, whatever you decide.
Book A Free Plant Walk
Tell us about your operation. We'll call within one business day to set a time that works around your shifts.
- Visit us250 S High Street, Suite 700, Columbus, OH 43215
- Call us(614) 555-0138
- Email ushello@gristmoorops.com