Pick The Roll-Off For The Phase
Rates include delivery, one haul and the tonnage shown. Extra tons are $85; rentals run 14 days.

No Crew Waits On A Dumpster
Harlan started in 2010 with two trucks and a promise to a framing crew in Salida: call before 10 and your swap happens today. Sixteen years later we run nine trucks across Stanislaus County and the promise is the same. Our dispatchers know the subdivisions, the gate codes and which supers want the container by the curb. You get the size you ordered, set where you marked it, and a weight ticket emailed after every haul.
- Dispatchfrom 6am, six days
- Placedwhere your super marks
- Weighttickets after every haul
- Permithelp for street drops
Construction Debris We Take
Mixed loads are fine in a 20, 30 or 40. Concrete, dirt and rock go in a heavy-debris 10.
Lumber and framing offcuts
Studs, sheathing, pallets and trim.
Drywall and insulation
Scraps, old sheets and bagged batts.
Roofing shingles
Asphalt shingles and felt from a tear-off.
Flooring and cabinets
Carpet, pad, tile, vinyl and old cabinet boxes.
Siding and windows
Vinyl, wood and fiber-cement siding, old window units.
Packaging
Cardboard, crates and wrap from deliveries.
Book A Swap-Out Today
Call dispatch before 10am and the empty one lands the same day.
Set Up Once, Order By Phone
Monthly Billing
One invoice, every haul listed by job address and date.
Weight Tickets
Emailed to your office after every haul — no chasing paper.
One Dispatcher
The same person knows your sites and your supers.
Many Sites
Run roll-offs on several jobs at once on one account.
What Our Contractors Count On
Swaps The Same Day
Booked by 10am, done today — so the crew never waits on a full container.
The Rate You Were Quoted
Delivery, a haul and the tonnage shown. Overage is $85 a ton, on the ticket.
Fourteen Days Standard
Enough time for a phase. Longer rentals billed by the day.
Trucks That Fit Tight Lots
Our drivers place roll-offs between framed houses and stacked lumber.
Contractors On Harlan
We run four framing jobs at a time. Harlan swaps the 30s the same morning I call and emails the weight ticket before lunch. My supers stopped asking where the dumpster is.
Tear-off days are brutal on a schedule. They dropped a 20 the afternoon before, pulled it full at 2pm and had an empty one back before we loaded the last bundle.
The account billing is the reason we stayed — one invoice a month, every haul listed by job address. Makes closing out a project a lot easier.

Modesto And Stanislaus County
Our yard sits in north Modesto, so most of the county is a short run. Job sites farther out are quoted with a small trip charge.
- ✓Modesto, Salida and Empire
- ✓Riverbank, Oakdale and Escalon
- ✓Ceres, Turlock and Hughson
- ✓Ripon and Patterson — ask about the trip charge
Construction Dumpster Questions
How much is a construction dumpster in Modesto?
Our 20-yard starts at $495, the 30-yard at $575 and the 40-yard at $650, each with delivery, one haul, 14 days and the tonnage shown. Extra tons are $85. Contractor accounts are billed monthly.
Which size do most builders order?
A 30-yard for framing and new builds, a 20-yard for roofing and remodels, and a 40-yard for demolition or bulky, light debris.
How fast is a swap-out?
Call dispatch by 10am and the empty container goes in the same day. After 10am it's first thing the next morning.
Can I put concrete in a regular roll-off?
No — concrete, dirt and rock are too heavy for a 20, 30 or 40. Order a 10-yard heavy-debris container, billed at a flat rate.
Do I need a permit to put a roll-off on the street?
Often, yes. Rules differ by city, so check local rules before placement — we'll tell you what our customers in that city usually file.
How do contractor accounts work?
Fill in the form with your company details. Once the account is open, you order by phone and get one invoice a month with every haul listed by job address.
Order A Roll-Off
Dispatch answers from 6am — (209) 555-0144. Or send the size and job site and we'll text you a drop time.
