Generation to Resilience
Engineering for owners, developers, and utilities — systems that pencil, permit, and perform.
Commercial Solar PV Design
Rooftop, carport, and ground-mount arrays engineered to real production, not brochure numbers.
Battery Storage Systems
Storage sized to the tariff and the mission — demand shaving, backup, or both.
Microgrids & Resilience
Systems that island gracefully when the grid fails — clinics, campuses, and communities kept running.
Interconnection & Permitting
Applications engineered to each utility's checklist — queues navigated, approvals on schedule.
EV Charging Infrastructure
Fleet and public charging designed with the utility capacity to actually support it.
Owner's Engineering & Due Diligence
Independent review of developer proposals — assumptions checked before the ink dries.

The Desert Is a Power Plant
New Mexico gets three hundred days of sun and some of the best solar economics in the country — but only for systems engineered honestly. We model with real weather data, derate like adults, and design for the dust, heat, and hail the brochure ignores. That's why our arrays produce what we said they would.
- ✓Production modeled on real Southwest weather
- ✓Designs that survive dust, heat, and monsoon
- ✓Tariff analysis before a single panel is picked
- ✓Licensed PEs who specialize in energy
Megawatts, Working
Ten years of Southwest sun turned into arrays, storage, and microgrids that just run.






Feasibility to First Kilowatt
Model the Site
Loads, tariffs, and solar resource analyzed — the honest math on what the site can earn.
Design the System
Arrays, storage, and interconnection engineered as one system, sealed by a PE.
Clear the Queue
Utility applications and permits managed to approval — the paperwork is half the project.
Verify Performance
Commissioning and first-year production review — the model meets the meter.

When the Grid Blinks, Yours Doesn't
Batteries changed the math. Storage now pays for itself shaving demand charges — and the same system keeps your operation alive through outages. We size storage to your tariff first, your resilience needs second, and the vendor's spec sheet never.
- ✓Demand-charge analysis drives the sizing
- ✓Islanding designed and tested, not assumed
- ✓Critical loads mapped and prioritized
- ✓Vendor-agnostic — the tariff picks the battery
What 95 Megawatts Teach
Derate Like You Mean It
Optimistic models sell projects; honest models finance them. Our ±2% track record is a derating discipline.
The Queue Is the Schedule
Interconnection timing rules everything. We file early, file right, and design to the utility's rules.
Dust Is a Design Load
Southwest arrays live with dust, hail, and 110-degree summers. Engineering for the brochure climate fails here.
Every Project Gets
PE-Sealed Design
Licensed engineers seal every design — accepted by utilities, AHJs, and lenders alike.
Bankable Production Models
Weather-based modeling that financiers trust — because it keeps matching the meter.
Incentives Captured
Federal, state, and utility programs identified and papered — money left on tables offends us.
Construction Oversight
Installer QA and commissioning by the engineer of record — built as designed.
Asked Before the Site Visit
Does commercial solar actually pencil in New Mexico?
Usually, and often strongly — high sun, rising rates, and current incentives make most commercial roofs cash-positive early. The feasibility model tells you exactly, before you spend real money.
Do you install, or just design?
We engineer — design, permitting, interconnection, and construction oversight. Installation goes to qualified contractors we spec and QA, which keeps the engineering honest and the bids competitive.
Is battery storage worth it without solar?
On demand-heavy tariffs, frequently yes — storage alone can shave peaks that dominate your bill. The tariff analysis answers it in a week.
What does a microgrid cost?
It scales with the loads you protect — a clinic's critical circuits cost far less than a whole campus. We map critical loads first, so you buy resilience where it matters.
How long does interconnection take?
Weeks to many months depending on the utility and system size. We've filed with every utility in the region — our applications are engineered to their checklists, which is why most clear on the first pass.
Can you review a developer's proposal we already have?
That's owner's engineering — an independent check of production models, assumptions, and contract terms. It routinely pays for itself in one corrected assumption.

The Sun Is Patient. The Programs Aren't.
Incentives and interconnection queues reward the prepared. Scope the system now and be ready when the window opens.
Tell Us About the Site
One business day to an engineer's reply — site, goal, and rough scale is all we need to start the math.